• LAST PRICE
    0.1900
  • TODAY'S CHANGE (%)
    0.0000 (0.0000%)
  • Bid / Lots
    0.1850/ 23
  • Ask / Lots
    0.2100/ 1
  • Open / Previous Close
    --- / 0.1900
  • Day Range
    ---
  • 52 Week Range
    Low 0.1200
    High 0.3000
  • Volume
    ---
    below average

Search Criteria

Filter search criteria using below inputs

Click on magnifying glass icon to search

Search Criteria - - - Stocks (0)
CompanyCountrySymbol

TD Direct Investing offers more research reports than any other discount brokerage in Canada. Provided from the industry's most trusted sources, our service includes timely, relevant information for the current trading day and comprehensive industry, sector, and insider trading reports for further analysis.

Open a New Account, or Login if you're a client.

  • Oct 15, 2024

      Show headlines and story abstract
    • 8:00AM ET on Tuesday Oct 15, 2024 by Dow Jones
      Companies Mentioned: WRR

      The Lapon Gold Project includes Lapon Canyon, the Pikes Peak claims located 4 kilometres to the north, and the Rattlesnake and Range Front claims 3 kilometres to the west and over 600 meters lower than the present drilling at Lapon Canyon. The Rattlesnake, Range Front, and Pikers Peak claims cover over 8 km of possible extensions of the range front zones to the west, north, and south of Lapon Canyon, adding several additional drill target areas to the project. Rattlesnake and Pikes Peak contain numerous historical mining and milling areas that consist of adits at different levels, shafts and underground workings, and a network of existing roads providing access throughout. Little or no exploration work has been carried out on these claims prior to Walker's arrival. It is notable that the Rattlesnake area and adits are on strike with the Lapon Canyon discoveries located 3 km on strike and 600 meters above.

Peers Headlines