• LAST PRICE
    0.7051
  • TODAY'S CHANGE (%)
    Trending Up0.0120 (1.7314%)
  • Bid / Lots
    ---/ ---
  • Ask / Lots
    ---/ ---
  • Open / Previous Close
    0.7229 / 0.6931
  • Day Range
    Low 0.7051
    High 0.7231
  • 52 Week Range
    Low 0.4000
    High 0.7760
  • Volume
    3,050
    below average

Search Criteria

Filter search criteria using below inputs

Click on magnifying glass icon to search

Search Criteria - - - Stocks (0)
CompanyCountrySymbol

TD Direct Investing offers more research reports than any other discount brokerage in Canada. Provided from the industry's most trusted sources, our service includes timely, relevant information for the current trading day and comprehensive industry, sector, and insider trading reports for further analysis.

Open a New Account, or Login if you're a client.

  • May 9, 2024

      Show headlines and story abstract
    • 7:10AM ET on Thursday May 09, 2024 by Dow Jones
      Companies Mentioned: ALDE

      All drill holes are diamond core holes with PQ, HQ or NQ core diameters. Drill core is collected at the drill site where recovery and RQD (Rock Quality Designation) measurements are taken before the core is boxed and transported to the Altar camp facilities, a short distance away, where the whole core is photographed under more optimum lighting conditions and geological quick log is produced. The whole-core is then marked and sampled into geological defined, systematic 1- to 2-metre sample intervals, unless the geologist determines the presence of an important geological contact, which should not be crossed. The whole-core is then cut-in-half with a diamond saw blade, with half the sample retained in the core box for future reference and the other half placed into a pre-labelled plastic bag, sealed with a two plastic security zip ties, and labeled with a unique sample number. The bagged samples are then placed into larger plastic sacks and those sacks are sealed with another plastic security zip tie and labelled for shipment. The sacks are then placed onto wooden pallets and wrapped in plastic shrink-wrap and stored in a secure area pending shipment to a certified ALS laboratory sample preparation facility located in Mendoza, Argentina, where the samples are dried, crushed, and pulverized. The resulting sample pulps are sent by batch to the ALS laboratory in Lima for geochemical assay analysis, including a 30g fire assay with an atomic absorption (AA) finish analysis for gold and a full multi-acid digestion (4-acid) with ICP-AES analysis for other elements. Samples with results that exceed maximum detection values for gold are re-analyzed by fire assay with a gravimetric finish and other elements of interest are re-analyzed using precise ore-grade ICP analytical techniques. Aldebaran independently inserts certified control standards (Super Certified Reference Materials (SCRM's), coarse field blanks, and duplicates into the sample stream to monitor data quality. These control samples represent 10-12% of the total samples submitted and are inserted "blindly" to the laboratory in the sample sequence prior to departure from the Aldebaran facilities.
    • 7:03AM ET on Thursday May 09, 2024 by Accesswire
      Companies Mentioned: ADBRF

      VANCOUVER, BC / ACCESSWIRE / May 9, 2024 / Aldebaran Resources Inc. ("Aldebaran" or the "Company") (TSXV:ALDE)(OTCQX:ADBRF) is pleased to report results for four drill holes of the 2023/2024 field campaign at the Altar copper-gold project in San Juan, Argentina. The holes reported herein (ALD-24-074EXT, ALD-24-240, ALD-24-241, ALD-24-238, and ALD-24-242) were all substantial step-outs to the north or south of known mineralization. Hole ALD-24-074EXT was designed to extend mineralization in the Altar United trend. Hole ALD-24-241 was designed to achieve three goals: (1) infill a gap in our drilling at the Altar United discovery, (2) drill perpendicular to many of the previous holes within the United area to ensure there is no bias in grades because of hole orientation, and (3) to test for continuity in between the existing fences of drill holes. Hole ALD-24-240 was designed to fill a gap in the existing drilling, and hole ALD-24-242 was designed to test the southern extent of the mineralized footprint at the Altar project. All holes successfully hit mineralization and expanded the footprint of the mineralized system, while ALD-24-241 returned one of the highest-grade intercepts from the project to date. All four holes will provide valuable information for the upcoming mineral resource estimate, scheduled for H2 2024.

  • Apr 25, 2024

Peers Headlines

No documents available